Low-voltage systems consultingNetwork, cameras, screens.
Planned together.
We advise on how to run the cabling, network and devices before you close the ceiling. One plan for the lighting and all the low-voltage systems.

Everything that runs through a cable.
- Cabling and network cabinets
- Network in the store and office, including Wi-Fi
- Cameras and people counters
- Digital signage screens
- Lighting control gateways
One ceiling.
One drawing.
Luminaires, sensors, Wi-Fi access points and cameras in one plan. No chiselling after the ceiling is finished.
Cable routes planned together with the lighting design.
Checkouts, screens and the people counter on one network.
Wi-Fi in every room and lighting control from your phone.
The same standard in every store, described in the B2B portal.
Cable laid once.
Properly.
Before the ceiling.
Questions
Your most common questions.
What does low-voltage systems consulting cover?
Cabling and network cabinets, the network in a shop or office including Wi-Fi, cameras and footfall counters, digital signage screens and lighting control gateways. All in one plan with the lighting.
When should I plan the low-voltage systems?
Before the refurbishment, before you close the ceiling. The cable routes are then planned together with the lighting design, and luminaires, sensors, Wi-Fi access points and cameras all have their place on one drawing. Once the ceiling is closed, every change means breaking it open.
What should I prepare for the consultation?
The floor plan of the premises. We will look at it and tell you what to run where: cables, the cabinet, Wi-Fi access points, cameras and lighting control.
Why plan low-voltage systems together with the lighting?
Because both meet in the ceiling. When luminaires, sensors, Wi-Fi access points and cameras are in one plan, nothing gets in the way of anything else and the cable is laid once.
How does it work for a store chain?
Every store gets the same standard, described in the B2B portal: checkouts, screens and the footfall counter on one network. The next store follows the same plan.
Before you close the ceiling,
give us a call.
We will look at the floor plan and tell you what to run where.